Skip to content

Warning: Javascript is disabled.
For full functionality and best experience on our site, it is necessary to enable JavaScript.
Here is instructions to enable JavaScript in your web browser

Alaska Department of Natural Resources
Division of Mining, Land and Water

Management Plans
Knik River Public Use Area

banner image

Management Plan Downloads

(Adopted September 2008, Modified September 2012)

For more information about the Knik River Public Use Area, please see this site: https://dnr.alaska.gov/mlw/knik-river-pua/

Complete Plan PDF

Preface PDF

Includes: Cover / Title Page / Adoption Signature Page / Table of Contents

Chapter 1: Introduction and Background - Complete PDF

Includes: Summary of Purpose / The Planning Area / The Public Use Area / Why the Plan Was Developed / How the Plan Was Developed / How the Plan Will be Used / What the Plan Will or Will Not Do / Relationship of PUA Statutes to Other Statutes / Relationship to Other Plans and Agreements

Chapter 1 - Text PDF Map 1-1: Planning Area PDF Map 1-2: General Land Status PDF
Chapter 2: Goals and Management Guidelines - Complete PDF

Includes: Introduction / Definitions / Overall Management Direction / Access / Commercial Use / Coordination / Facilities / Fees / Fish and Wildlife Habitat / Forestry / Health and Safety / Heritage / Cultural / Materials / Mitigation / Parcel Acquisition / Public Use Sites / Recreation / Subsurface Resources / Trails / Waterbodies

Chapter 2 - Text PDF Map 2-1: Recommended Designated Shooting Areas PDF Map 2-2: Public Use Sites PDF Map 2-3: Forested Uplands & Un-vegetated Shorelands in Management Units A & C PDF Map 2-4: Wetlands PDF
Chapter 3: Management Guidelines, Recommendations, and Public Use Sites for Each Management Unit - Complete PDF

Includes: Introduction / Unit A - Lower Knik Flats / Unit B - Lakes and Wetlands / Unit C - Upper Knik Flats / Unit D - Upper Jim Alpine / Unit E - Upper Friday Alpine / Unit F - Grasshopper Valley / Unit G - Glacier / Unit H - Metal Creek

Chapter 3 - Text PDF Map 3-1: Management Units PDF Map 3-2: Proposed Waterbody Restrictions PDF
Chapter 4: Implementation - Complete PDF

Includes: Introduction / General Management of PUA Lands / Access to Public Lands / Trails Management Process / Knik River Special Use Areas / Amendments to Current Area Plans / Land Classification Order / Enforcement / Title 38 Requirements / Authority of Management Plan / Allowed and Prohibited Uses / Proposed Regulations / Fees / Other Lands / Navigable Waterbodies / Coordination with Other Agencies / Procedures for Plan Review, Modification, and Amendment / Recommended Future Studies

Back to Top