Seven Mile Lake Reroute Project Summary

In the summer of 2015, DNR was approached by the Alaska Department of Fish and Game about the possible use of existing federal Pittman-Robertson (P-R) funds for projects that would increase or preserve hunter access. DNR identified the Rex Trail as a high priority project that appeared to meet the criteria for the P-R funds; specifically, DNR applied for P-R funds to supplement approximately $243,000 of existing state capital improvement funds in order to construct a re-route around Seven Mile Lake, one of the worst spots on the trail, and one of the few spots where the trail is on private property. In December 2015, the grant was awarded resulting in $720,000 of additional funding for the project.

The Prescription Report indicated that unlike the Site 4 Small Vehicle Reroute site, where the existing trail may be able to sustain long-term accessibility by a wide variety of larger tracked and wheeled vehicles, the existing trail through Seven Mile Lake area is unlikely to sustain long-term use by any vehicles, including ATV's, tracked vehicles, and larger wheeled vehicles. It indicated that at both Site 1 and Site 2 (both within the proposed Seven Mile Lake Reroute project), a constructed trail would be required. Although the Prescription Report did not recommend a reroute of the trail for either site, the Department decided that it would be beneficial to relocate the trail on undisturbed lands outside of the private property to both simplify construction as well as move the active tread of the trail onto State lands, and consist of essentially a primitive gravel road. This would allow all users to both bypass the existing extensively damaged (and at times nearly impassible) portion of the trail, as well as allow users to remain on State land. DNR is currently working with the Department of Transportation and Public Facilities to produce a design and a construction contract that would be put out to bid later this fall or winter. Construction is anticipated to be completed by June 30, 2018.

Map of Proposed Project

Rex Trail Index
Trail Braids in Winter