Red Dog Mine May 2009 Reclamation and Closure Plan Supporting Documents

Red Dog Mine Closure and Reclamation Plan

Supporting Document A:  Consultation & Property Description
A1 Closure Workshops (contact Jack DiMarchi for CD)
A2 Legal Description of Property

Supporting Document B:  Plans of Operations
B1 Red Dog Mine Development Plan
B2 Plan of Operations for Waste Rock Management
B3 Plan of Operations for Tailings and Water Management

Supporting Document C:  Geotechnical
C1 Main Waste Stockpile Stability Assessments
C2 Drawings from Updated Geotechnical Report
C3 Dam History Report
C4 Preliminary Conceptual Design Report
C5 Stability Analysis for Future Raises to Closure
C6 Seepage Analysis Report
C7 Drawings from Back Dam Investigation and Design
C8 Preliminary Spillway Design

Supporting Document D:  Geochemistry
D1 Consolidation of Studies on Geochemical Characterization of Waste Rock & Tailings
D2 Supporting Geochemical Review and Interpretation
D3 Aqqaluk Geochemistry - Supplemental Testing Program
D4 Lime Requirements and Predicted Geochemical Changes

Supporting Document E:  Water Management
E1 Red Dog Water and Load Balance
E2 Flood Frequency Update for Middle Fork Red Dog Creek
E3 Red Dog Creek Rediversion Design Criteria & Plan
E4 Assessment of Water Treatment Methods Applicable for Closure
E5 Assessment of Methods for Managing Post-Closure Water Treatment Sludge

Supporting Document F:  Reclamation and Revegetation
F3 Revegetation Plan for the Red Dog Mine

Supporting Document F:  Reclamation and Revegetation
F1 Mine Area Closure Options - Summary of the Cover Studies
F2 Evaluation of Borrow Sources

Supporting Document G:  Demolition
Demolition Cost Estimates

Supporting Document H:  Ecological Risks
Evaluation of Ecological Risk within the Ambient Air/Solid Waste Permit Boundary

Supporting Document I:  Monitoring Plans

Supporting Document J:  Cost Estimates
J1 Basis of Estimate - Cost Estimate
J2 Basis of Estimate - Post-Closure Costs
J3 Basis of Estimate - Suspension Costs
Memorandum - State of Alaska, Department of Revenue, Treasury Division