TAPS Amendments
- TAPS, No. 1, Sec. 1d ii, 6-24-81
- TAPS, No. 2, PLMP 384.4, PIG Launcher-Receiver Facility, 1-14-93
- TAPS, No. 3, PLMP 378.7, Erosion Control, Hess Creek, 6-2-94
- TAPS, No. 4, PLMP 46.5 - 48.5, Spur Dikes 6, 7, 8; 6-2-94
- TAPS, No. 5, PLMP 22, Spur Dike 3A, 10-4-94
- TAPS, No. 6, PLMP 76.7, Laydown Area, Material Storage, 10-21-94
- TAPS, No. 7, PLMP 57.7 - PS 2 and 104.2 - PS 3, Maintenance Support Activities, 5-9-95
- TAPS, No. 8, PLMP 231.5, Revetment, MFKR, 5-9-95
- TAPS, No. 9, PLMP 196, Diversion Dike, Dietrich River Floodplain, 10-10-95
- TAPS, No. 10, PLMP 243.6, Diversion Dike, MFKR, 3-5-96
- TAPS, No. 11, PLMP 76 and 84, Anode Beds, Sag. River, 5-30-96
- TAPS, No. 12, Relocate and maintain 800 ft. section of workpad to maintain vehicular access, 6-13-96
- TAPS, No. 13, PLMPs 597 to 617, Cathodic Protection, Oxbow Lake, 8-7-96
- TAPS, No. 14, Bank Stability, McCallum Creek, 8-30-96
- TAPS, No. 15, DRA Injection Facility, 8-30-96
- TAPS, No. 16, PLMPs, 790 to 800, Cathodic Protection, Dayville Road, 11-5-96
- TAPS, No. 17, PLMPs 242.8 and 243.8, Diversion Dikes, MFKR, 2-19-97
- TAPS, No. 18, PLMP 197.5, Bank Erosion, Dietrich River Floodplain, 9-8-97
- TAPS, No. 19, PLMP 778.7, Cathodic Protection, Sheep Creek Camp, 9-10-98
- TAPS, No. 20, PLMP 218.5, Revetment Structure, MFKR, 3-19-99
- TAPS, No. 21, PLMP 686.7, Revetment Structure, Tazlina River, 4-1-99
- TAPS, No. 22, PLMP 185.8, Revetment Structure, Dietrich River, 4-19-99
- TAPS, No. 23, PLMP 76.0, Cathodic Protection, Sag. River, 10-14-99
- TAPS, No. 24, PLMPs 18.7, 47.2 and 67.8; Cathodic Protection, 3-1-00
- TAPS, No. 25, PLMP 367.2, Cathodic Protection, 6-19-00
- TAPS, No. 26, PLMP 397.3, Cathodic Protection, Manley Hot Springs Road, 7-31-00
- TAPS, No. 27, 687.0, Containment Berm and Diversion Dike, Tazlina River, 9-18-01
- TAPS, No. 28, Sec. 2C, Renewal Term of up to 10 Years, 6-28-02
- TAPS, No. 29, PLMP 72.3 Revetment, Sag. River, 8-5-02
- TAPS, No. 30, PLMP 32.8, Revetment Structure, Sag. River, 9-13-02
- TAPS, No. 31, Renewal of Lease, 30 Years, 11-26-02
- TAPS, No. 32, PLMP 230, Revetment Structure, MFKR, 1-13-03
- TAPS, No. 33, PLMP 228.9, Revetment, MFKR, 1-15-03
- TAPS, No. 34, PLMP 219.5, Revetment, MFKR, 2-14-03
- TAPS, No. 35, PLMP 217, Revetment Structure, MFKR, 1-23-04
- TAPS, No. 36, PLMP 67.8, Revetment, Sag. River, 4-29-04
- TAPS, No. 37, PLMP 242.8, Revetment, MFKR, 4-6-04
- TAPS, No. 38, PLMP 271.4, Revetment, Jim River, 6-8-04
- TAPS, No. 39, Power Line Tie-In, PS1, 1-20-05
- TAPS, No. 40, PLMP 531.4, Bank Repairs, Tanana River, 4-14-05
- TAPS, No. 41, PLMP 686.5, Bank Repairs, Tazlina River, 6-3-05
- TAPS, No. 42, Revetment Structure, Dietrich River, 8-5-05
- TAPS, No. 43, Stipulation 3.4.1.1, Linewide, 1-5-06
- TAPS, No. 44, PLMP 39.3, Sag. River, Channel Weir, 3-15-06
- TAPS, No. 45, PLMP 85 Sag. River, 4-17-06
- TAPS, No. 46, PLMP 72.4, Sag. River Revetment Extension, 7-5-06
- TAPS, No. 47, PLMP 37.8 ,Grade Control Structure, Sag. River, 3-29-07
- TAPS, No. 48, PLMP 24.7, Channel Plug Reconfiguration , Sag. River 7-18-07
- TAPS, No. 49, PLMP 57.7, PS2 Workpad Expansion, 4-23-08
- TAPS, No. 50, Stipulation 3.2.1.1, 6-16-09
- TAPS, No. 51, Dietrich River Guidebank Extension, PLMP 200.8, 9-8-09
- TAPS, No. 52, Cathodic Protection System, TAPS Access Road 7 APL-2, PLMP 766.6, 8-26-10
- TAPS, No. 53, Sagavanirktok River Buried Sill, PLMP 47, 9-9-2010
- TAPS, No. 54, PLMP 19, Sag. River Buried Sill, 6-14-12
- TAPS, No. 55, PLMP 25, Cathodic Protection Upgrades 6-25-12
- TAPS, No. 56, Fuel Gas Line Manual Gate Valve Replacements 8-9-12